Difference between revisions of "Pumper Overview"

From PRAMS Plus Wiki
Jump to navigation Jump to search
m (Site and EHS Activity Tab)
m (Equipment Tab)
Line 148: Line 148:
 
   
 
   
 
The equipment tab can be brought into the Production Tab with the other readings by adding 'Equipment Entry' in [[PumperX2 Layout Manager]].
 
The equipment tab can be brought into the Production Tab with the other readings by adding 'Equipment Entry' in [[PumperX2 Layout Manager]].
 +
 +
Many different options are available to customize with this tab in Analyst.
  
 
[[File:PumperX2 Equipment Tab.png]]
 
[[File:PumperX2 Equipment Tab.png]]

Revision as of 18:13, 15 January 2020

The main screen of PumperX2 will show when 'Start Entry' from the previous screen when the app is launched. This scene will be where the work is done and allow you to view data that has been entered.


PumperX2 Overview.png

Control Panel

Some of the following features are not availible in offline mode and have to be done another way.

Messages

This section mainly controls behavior of the data presented in the list along with other options in the form of buttons.

The first part will show if you have any available messages from anyone set up in Analyst, this will be highlighted yellow for new messages.

Once open you can select the message from the sender and read, reply, or forward it. Messages cannot be deleted.

You can also send a message by using the far right symbol next to help on the main screen. You can also view messages on Analyst or Insight Cards.

PumperX2 new message.png

PumperX2 message example.png

PumperX2 Send Message.png

Site List and Options

To control the list, select a period. If you select the current month it will show as many days as you have set back or how many days you are allowed to view/edit in the permissions under User Maintenance in Analyst.

Next select the route from the drop-down. If you do not see this contact your Analyst to have them assign it to you.

You can view the sites by the User_ref (Name your company uses) or Name (Official Reg name). If you have many wells you can find it in the find box and it will highlight it grey then you can select the well by double clicking.

The buttons in the control panel are shown here:

PumperX2 Pumper Options.png
PumperX2 Reorder sites.png

Change Site Display Order

Will open a new window allowing you to click and drag the sites to a custom order. Sites can also be placed into other sites such as a battery with wells.

If the route changes are not ideal you can reset to the original layout.







Last Entry Date Report

Select one of the three options:

Last entry Review This selection will bring up all sites on the current route and diaplay the last entry Prams has along with how many days back from current it is. PumperX2 Date Review.png
Route Review Report By selecting a route and a date then clicking 'Create Report' a day report is created that will display the sites individual day totals and a overall route total.
PumperX2 Route Review.png
Update Hours On/Down Select the route from the drop-down and the entry date hit enter, this will show all the sites it found for the setting then select next. Then
PumperX2 Hours Down.png

Reload Setup Info / Expand Nodes

Selecting the reload symbol will pull in any new changes made outside of the open Pumper program. It is the same as closing and reopening the program. Use this to pull in any layout changes or changes to routes.

If using offline entry, save any changes and sync your data, then reset data to pull down new changes.

Nodes - The last two buttons in the row are to open or close the set ups from the previous 'Change Site Display Order' selection. If you have multiple batteries with wells embedded into it you can close all the batteries at once or open them all at once.

GoTo Meeting

The orange icon is to go to a GoTo Meeting which allows a representative of prams to connect to your PC with a code and help solve an issue.

To learn more click here


Other Options

PumperX2 Other Options.png

Below the list of sites there are four buttons:

  • Edit Selected Site - If you select a site by clicking once you can then select this button and it will open the site for editing.
  • Save Changes - Once you have all your changes made to the records, you can select this button to save that data. Alternatively you can select another well prompting a save changes window.
  • Exit Entry Process - Selecting this button will close out of pumper if in direct mode and if in offline entry it will take you back to the synchronize screen.
  • Other Options - This button will open the following menu where you can change the way the date shows on the entry screen by ascending or descending.

Enable Dynamic Tank Entry that auto shortens the gauges if you have more than three. When you select the gauge it will open up for entry. This is used to save space on the screen especially with Color-cut tanks.

There is a check-mark box that will allow you to auto hide the chart at the bottom if it is in the way rather than hiding it each time.

You can also add colors to your columns signifying the most important entries or show some one which column need to be entered. These can be reset if need be.

Lastly the Password tab will allow you to change your password if you were given permission to do so.

Data Entry

Production Tab

This screen allows you to enter in the data captured from the tanks, meters, tubing and casing, leave remarks for the day and many other possibilities.

Every site in PumperX2 is controlled by a 'Layout' as displayed in the bottom left of the entry panel. This controls the columns displayed, a layout can be defined in Analyst under Admin > PumperX2 Layout Manger.

Certian options in this list can add in large sections such as 'Equipment' depending on how it was set up. Normally equeptment has it own tab but can be modifyed to appear in the main entry screen.

Data can be entered in multiple ways. When you first click on a site it will take you to the next blank row of data that needs to be entered. Most first columns are Hours On and when the data is entered just select enter on the keyboard. This will move you right to the next column.

Rather than enter in all the data one by one, shortcuts have been added for situations.

  • "F5" - Will bring down all the previous days data from the tank gauges. This will only work if there is no other data past the row you want to enter data on. A great option for a shut in status.
  • "F6" - Will bring down the previous days meter entry. This is useful for a meter reading that doesn't change much.
  • "F9" - Will change the way data is entered going from left->right to Top->Bottom entry when you are in a cell and select enter.

If you find you are entering data and its not allowing you to enter in data for a day in the past but will allow for current day forward check with your Analyst to make sure that the well can be entered in for the time period.

If there is downtime there is a reason and a down-code must be displayed as well as a remark entered for the day before you can save. The down-codes can be edited in Analyst under Tools > Downcode Maintenance.

Inspections

Facility Inspection, APCE Reporting, and AVO Inspections can also be entered into pumper. They will all have their own default question but can be edited in Analyst under Tools > EHS Site Activity Definitions, Facility Inspection Set Up, and APCE Inspection Setup. The amount of questions and weather or not a remark is required can be controlled from these setting.

The reports can be done Weekly, Monthly, or Annually. For radio buttons you can select yes or no and then using the arrows to move to the next, you can hit space bar to fill in the circle.

PumperX2 Facility Inspection.png
PumperX2 APCE Inspection.png
PumperX2 AVO Inspection.png

Equipment Tab

In order for this tab to appear Equipment needs to be set up on the well. To learn how to set up equipment in Analyst click here

The equipment tab can be brought into the Production Tab with the other readings by adding 'Equipment Entry' in PumperX2 Layout Manager.

Many different options are available to customize with this tab in Analyst.

PumperX2 Equipment Tab.png

Site and EHS Activity Tab

This section will PumperX2 EHS activity Tab.png

Dairy Tab

Fluid Level Tab

Chart

The chart


Copyright © 2024 by PRAMS Plus LLC. All Rights Reserved.