Difference between revisions of "Pumper Overview"

From PRAMS Plus Wiki
Jump to navigation Jump to search
m
m
Line 5: Line 5:
  
 
==<u>'''Control Panel'''</u>==
 
==<u>'''Control Panel'''</u>==
 
+
''Some of the following features are not availible in offline mode and have to be done another way.''
  
 
===<u>'''Messages'''</u>===
 
===<u>'''Messages'''</u>===
Line 35: Line 35:
 
[[File:PumperX2 Reorder sites.png|border|right|200px]]
 
[[File:PumperX2 Reorder sites.png|border|right|200px]]
  
'''Change Site Display Order'''  
+
====<u>'''Change Site Display Order'''</u>====
  
 
Will open a new window allowing you to click and drag the sites to a custom order. Sites can also be placed into other sites such as a battery with wells.
 
Will open a new window allowing you to click and drag the sites to a custom order. Sites can also be placed into other sites such as a battery with wells.
Line 53: Line 53:
  
  
'''Last Entry Date Report'''
+
====<u>'''Last Entry Date Report'''</u>====
  
 
Select one of the three options:
 
Select one of the three options:
Line 71: Line 71:
 
|-
 
|-
 
|}
 
|}
 +
 +
====<u>'''Reload Setup Info / Expand Nodes'''</u>====
 +
 +
Selecting the reload symbol will pull in any new changes made outside of the open Pumper program. It is the same as closing and reopening the program. Use this to pull in any layout changes or changes to routes.
 +
 +
If using offline entry, save any changes and sync your data, then reset data to pull down new changes.
 +
 +
'''Nodes''' - The last two buttons in the row are to open or close the set ups from the previous 'Change Site Display Order' selection. If you have multiple batteries with wells embedded into it you can close all the batteries at once or open them all at once.
 +
 +
====<u>'''GoTo Meeting'''</u>====
 +
 +
The orange icon is to go to a GoTo Meeting which allows a representative of prams to connect to your PC with a code and help solve an issue.
 +
 +
To learn more click [[GoTo Meeting|here]]

Revision as of 21:44, 14 January 2020

The main screen of PumperX2 will show when 'Start Entry' from the previous screen when the app is launched. This scene will be where the work is done and allow you to view data that has been entered.


PumperX2 Overview.png

Control Panel

Some of the following features are not availible in offline mode and have to be done another way.

Messages

This section mainly controls behavior of the data presented in the list along with other options in the form of buttons.

The first part will show if you have any available messages from anyone set up in Analyst, this will be highlighted yellow for new messages.

Once open you can select the message from the sender and read, reply, or forward it. Messages cannot be deleted.

You can also send a message by using the far right symbol next to help on the main screen. You can also view messages on Analyst or Insight Cards.

PumperX2 new message.png

PumperX2 message example.png

PumperX2 Send Message.png

Site List and Options

To control the list, select a period. If you select the current month it will show as many days as you have set back or how many days you are allowed to view/edit in the permissions under User Maintenance in Analyst.

Next select the route from the drop-down. If you do not see this contact your Analyst to have them assign it to you.

You can view the sites by the User_ref (Name your company uses) or Name (Official Reg name). If you have many wells you can find it in the find box and it will highlight it grey then you can select the well by double clicking.

The buttons in the control panel are shown here:

PumperX2 Pumper Options.png
PumperX2 Reorder sites.png

Change Site Display Order

Will open a new window allowing you to click and drag the sites to a custom order. Sites can also be placed into other sites such as a battery with wells.

If the route changes are not ideal you can reset to the original layout.







Last Entry Date Report

Select one of the three options:

Last entry Review This selection will bring up all sites on the current route and diaplay the last entry Prams has along with how many days back from current it is. PumperX2 Date Review.png
Route Review Report By selecting a route and a date then clicking 'Create Report' a day report is created that will display the sites individual day totals and a overall route total.
PumperX2 Route Review.png
Update Hours On/Down Select the route from the drop-down and the entry date hit enter, this will show all the sites it found for the setting then select next. Then
PumperX2 Hours Down.png

Reload Setup Info / Expand Nodes

Selecting the reload symbol will pull in any new changes made outside of the open Pumper program. It is the same as closing and reopening the program. Use this to pull in any layout changes or changes to routes.

If using offline entry, save any changes and sync your data, then reset data to pull down new changes.

Nodes - The last two buttons in the row are to open or close the set ups from the previous 'Change Site Display Order' selection. If you have multiple batteries with wells embedded into it you can close all the batteries at once or open them all at once.

GoTo Meeting

The orange icon is to go to a GoTo Meeting which allows a representative of prams to connect to your PC with a code and help solve an issue.

To learn more click here