Difference between revisions of "List of Tasks"
Line 136: | Line 136: | ||
|- | |- | ||
|Weekly Production Review | |Weekly Production Review | ||
− | | | + | | Sums up each site by a variant for oil, gas, and water for the 7 day time frame also providing an average for each product. |
|[[File:Manage Schedule Tasks Weekly Prod Report.png|center|thumbnail]] | |[[File:Manage Schedule Tasks Weekly Prod Report.png|center|thumbnail]] | ||
|- | |- | ||
Line 144: | Line 144: | ||
|- | |- | ||
|Weekly Single Product Report | |Weekly Single Product Report | ||
− | | | + | | Sums up each site by a single variant being oil, gas, or water for the 7 day time frame also providing an average for each product. |
+ | Supports logo use. | ||
|[[|center|thumbnail]] | |[[|center|thumbnail]] | ||
|- | |- | ||
Line 170: | Line 171: | ||
| | | | ||
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} |
Revision as of 21:51, 3 July 2019
Below are all Canned and Custom tasks available in PRAMS.
If there is a custom report that is not available in your installation please contact PRAMS for more details. Phone Number: 303-904-6855
Canned 'Built-In' Reports
30 Production Recap | A snapshot of the last 30 days from a given date. | |
7 Day Prod/w Cums | Will display the last seven days with average, total production, and monthly cum. | |
Auto Fill Daily Shut In | This task will fill in the gauge sheet in PumperX2 if the day previous has 24 hours down and is Shut In.
It will generate a report that shows the count of how many sites this was applied to. |
|
Custody vs Check Report | Showing the last 7 days of production for sales compared to the check meter reading.
Will provide a difference in total MCF and in %. |
|
Daily Allocation | Automatically runs allocation for anything that is set up to allocate. Can be set up to run Once, Daily, Weekly, or Monthly.
Can be set to Default or Enhanced logging. |
|
Daily Allocation (Catch Up) | Allocates all or user set sites for one month set in a date rage as mm/02/yy - mm/01/yy. The more sites, the longer this allocation will run.
Set this allocation to run monthly towards the end of the work day. Can be set to Default or Enhanced logging. |
|
Daily Flare Report | Will send a report that will show total flared volume broken down by site. Also shows the previous volume total. | |
Daily Injection Report | Will generate a report that will show the injected volume, hours on, remarks, tubing pressure, and casing pressure. | |
Daily Production (Simple) | A simplified version of Daily Production Report, that shows hours on/off, daily volumes, pressures, stroke data, and remarks. | |
Daily Production Alert | Will show any set triggers set in Global Settings. | |
Daily Production Charts | Displays a report that shows the production data for a site. The data displayed is a year back from the date specified.
There are 5 total variants for this task and supports logo use. |
|
Daily Production Export | Provides a excel document that shows production and pressure with remarks per day by site along with API.
There are 3 total variants for this task. |
|
Daily Production Report | Will provide a report summary based on set variant that will show a total summary at the top with individual broken down summaries below.
There are 16 total variants for this task. Supports logo use. |
|
Daily Production Variance Report | Shows daily production set by variant compared against the 30 day average of the site for oil, gas, and water.
There are 12 total variants for this task. |
|
Daily Tank Levels | Provides an inventory summary broken down by route that shows the daily gauge for each tank and the total stock it has accumulated. | |
Gas Prod/Downtime Report | Takes the days produced gas production and compares it to the prior day showing the difference. Takes the downtime hours and sums it by set variant.
There are 7 total variants for this task. |
|
Gauge Sheets | Will provide the selected site gauge sheets for the previous month or for the current month as it progresses. | |
Line Pressure Alert | Will display any site that is over the threshold set when setting up the task. | |
Mail Grab | Typically used to grab a SCADA file before import.
This task can go to a specific email set to search a subject line (set in Subject) to save any attachments to a specified folder path then archive withing the email account. |
|
Off Trend Alert | ||
Oil Prod/Downtime Report | Takes the days produced oil production and compares it to the prior day showing the difference. Takes the downtime hours and sums it by set variant. | |
Production By Day | A highly detailed report that provides either the first or last 120 days of production in the life of a site. Also provides a chart showing the 120 day progress.
Multiple sites will be stored in tabs in the bottom of the excel document. |
|
Tests By Day | A highly detailed report that provides either the first or last 120 days of daily well tests in the life of a site. Also provides a chart showing the 120 day progress.
Multiple sites will be stored in tabs in the bottom of the excel document. |
|
Weekly Production Report | Provides a snapshot of the week from the day ran with a 7 day average for oil , gas, and water.
Supports logo use. |
|
Weekly Production Review | Sums up each site by a variant for oil, gas, and water for the 7 day time frame also providing an average for each product. | |
Weekly Production Variance | ||
Weekly Single Product Report | Sums up each site by a single variant being oil, gas, or water for the 7 day time frame also providing an average for each product.
Supports logo use. |
[[|center|thumbnail]] |
Well Test Exception | [[|center|thumbnail]] | |
Well Water Create | [[|center|thumbnail]] |
Custom Reports
Daily Exec Summary (CCI) | |
Daily Production Report (DJR) | |
Monthly Well Info (NPE) |