Difference between revisions of "Entering Data with PRAMS X2M"

From PRAMS Plus Wiki
Jump to navigation Jump to search
m (Oil)
m (Oil)
Line 176: Line 176:
  
 
[[File:X2m oil ticket tank.jpg|border|200px]][[File:X2m oil ticket meter.jpg|border|200px]]
 
[[File:X2m oil ticket tank.jpg|border|200px]][[File:X2m oil ticket meter.jpg|border|200px]]
 +
 +
To enter water ticket select the 'Add Ticket' button and you will be brought to the water ticket entry screen.
 +
 +
Three different type of entry are available that can be selected by using the tabs at the top. 
 +
 +
*Tank - Enter gauges to calculate a volume
 +
*Rolling Meter - Enter a beginning and ending reading to calculate a volume.
 +
*Direct - Enter the volume for the ticket directly.
 +
 +
Always make sure to save the ticket by selecting 'Save Ticket' at the bottom as backing out will lose the ticket information.
 +
 +
[[File:X2m water ticket tank.jpg|border|200px]]
 +
 +
Other dispositions can be used to add or takeaway volume for specific circumstances. If you are unsure when to use them please contact support or your analyst.
  
 
=====<u>Gas</u>=====
 
=====<u>Gas</u>=====

Revision as of 23:06, 20 November 2024

This page will show how to enter data by navigating Routes and sites with helpful visual queues to show data already entered.


PRAMS X2M


Accessing Routes

To start entering you need to have at lease one account setup. For more on setup click here.

Synchronizing Data

A major part of PRAMS X2M like with PumperX2 is the synchronization of data and understanding the process to the be able to send data and receive data.

After an account is setup and when you enter the app for the first time you will arrive on the 'PRAMSPlus Accounts' screen.

Select the account you want to use. Keep in mind if multiple accounts have been setup the screens after will only affect the account chosen.

After selecting an account you will be brought to the 'Synchronize Data' screen. At the top just under the page title the account information will be displayed.

If this is the first time syncing data all other buttons but 'Reset Data' will be greyed out to signifying that there is no database to enter data on.

X2m 2.png

When selected it will pull down the most current information on the companies main database.

If there currently is data and you try to reset you will receive a warning to confirm the reset.

X2m 3.png

If 'Yes' is selected then the current data on the phones database will be erased and the current database information on the main server will be pulled down.

If 'No' is selected you will be returned to the sync screen.

Once the data starts the reset process, after a brief loading screen, you will be sent to the 'Routes' screen.

Daily Sync Process

The rinse and repeat routine of the sync process goes as such and should be done daily:

  1. Reset Data - Do this before entry to assure the database is up-to-date with any data another pumper or office user may have entered. Doing so will save time in the long run.
  2. Enter Data - Enter as much data as needed throughout the day.
  3. Synchronize Data - This step will assure that your data goes to the main database and that everyone can view the data entered for the day.

Keep in mind the last person to enter data will overwrite any other data entered.

Doing this process everyday data is needing to be entered will help keep the main office an yourself updated and alleviate any database issues on your device.

Sync Issue Troubleshooting

When syncing or entering data, if an issue occurs, please call for support at 303-904-6855 Opt.1.

If there is a significant amount of data needing to be sent do not select 'Reset Data'

Otherwise if there was little to no data entered feel free to select 'Reset Data' as this will clear most database issues. A warning will be issued if there is data and only press yes if you are 100% sure there is nothing of value to lose.

When on the phone with a Prams representative they will guide you through the following data recovery process:

On the synchronize screen, select the cog icon at the top right.

Then select 'Email My Database', a db.sqlite file will be generated.

X2m 6.png

Next select the app that you use on your phone that you use for emailing. A email will be filled out and all that's needed is to press send.

X2m 7.png X2m 8.png

After the file is received the Prams Representative will be able to sync up your data.

After the file is successfully synced on Prams side, select 'Reset Data' and then 'Yes'. Doing so will pull down the changes and start your database fresh.

Navigation and Entering Data

Selecting Routes and Sites

To start entering data, after selecting an account, you will arrive on the Synchronize Data screen.

If you have not started entry for the day select Reset Data to pull down the most current data otherwise press skip to go to the Routes screen.

To navigate the routes screen the following options are available:

  • Back button X2m back.png to return to the previous screen
  • Spyglass button X2m spyglass.png to search for a Route. Press the X to stop the search.
  • Date Navigation arrows X2m date nav.png to move between dates.
    • Note you cannot go past the amount of days set for you to view and cannot edit day past the amount set. Your analyst can change these numbers if need be.
  • Summary arrow X2m summary.png to view the route/sites quick summary for the day.
  • Route name will take you to the sites that are available to the route.

After selecting a route you will be brought to the sites page and all the same buttons and arrows apply.

Route/Site Summary

After data has been entered for the day a quick review route/site summary can be displayed by selecting the arrow to the right of the route/site name.

To the left of the name will be a dot to signify the data entered on the route:

  • X2m solid.png - Current days data that has been entered.
  • X2m outline.png - Signifies a day prior to the current day that has been entered.
  • X2m error.png - Show that there is an error on the route/site that needs to be fixed before being able to be synced.

X2m summary detail.png

Site Data Entry

After picking a site the Data Entry screen will appear.

The very top of the screen will show you what site you are on and what date you are currently entering for.

Use the arrows by the date to navigate forwards or backwards between dates. Alternatively selecting the date will bring up the calendar allowing for a quicker way to select a date of entry.

To navigate between site info products and any other page in the Data Entry section swipe left or right.

When finished either select the back arrow at the top left, the back button on your phone, or on the Summary page select the 'Back to Site List' button.

X2m data entry.png

Site Info

After a site has been selected, the first page on Data Entry will be the site page.

The amount of fields requiring entry can change depending on the layout required by the Analyst.

X2m site info 1.png

Down codes

When hours down are present a down code will be required.

If the down code you are looking for is not present please let your analyst know as they can add to the list. You will receive the changes after the next sync or reset.

The list can be scrolled through if there are more codes than what the screen allows.

X2m down code.png

Extra Seal Off/On

When selecting the button 'Add Seal' you will be taken to the following screen where you can enter extra seals for a tank on site:

X2m xtra seal.png

The Valve Type dropdown contains a list that is maintained by the analyst.

Make sure to save the data by clicking 'Save Seal', if the back button is selected the entered seal data will be lost.

Once the data is saved you will return to the Site Info page.

Fluid level

Like Extra Seals when the 'Add Fluid Levels' button is selected you will be taken to the following screen:

X2m fluid level.png

Make sure to save your data by selecting 'Save Fluid Level'. Once saved you will return to the Site Info screen.

Oil

For Oil data entry tanks and meters will be displayed across all products.

Tank stocks will calculate when the foot, inch, and quarter inch gauges are entered.

If the site is color cut there will be both oil(total fluid) and water entries available.

To pull down the previous days gauges select the 'Pull Icon' X2m prev pull.png. This is helpful for sites that are shut in or to pull across many tanks and modify one or two.

If previous Frac/Test tank volumes are present they will be displayed as they need to be kept current otherwise a loss of oil will occur.

X2m oil entry.jpg

To enter Oil Tickets select the 'Add Ticket' button an you will be taken to the following screen:

The ticket is calculated as you enter and can be seen at the bottom. When everything is filled out select 'Save Ticket'. If you back out the ticket data will be lost.

To change the entry type to Meter select the tab at the top.

X2m oil ticket tank.jpgX2m oil ticket meter.jpg

To enter water ticket select the 'Add Ticket' button and you will be brought to the water ticket entry screen.

Three different type of entry are available that can be selected by using the tabs at the top.

  • Tank - Enter gauges to calculate a volume
  • Rolling Meter - Enter a beginning and ending reading to calculate a volume.
  • Direct - Enter the volume for the ticket directly.

Always make sure to save the ticket by selecting 'Save Ticket' at the bottom as backing out will lose the ticket information.

X2m water ticket tank.jpg

Other dispositions can be used to add or takeaway volume for specific circumstances. If you are unsure when to use them please contact support or your analyst.

Gas

For gas entry all meters across different products will be displayed.

Direct, rolling, and square root/ linear entry methods will be available.

If a meter isn't available the other dispositions section can be used.

X2m gas entry.jpg

Water
Daily Test
Diary
Summary

Copyright © 2024 by PRAMS Plus LLC. All Rights Reserved.