'''Individual Site Corrections'''
 +
To correct monthly production data for a single well, select Monthly Processes / Corrections and select Individual Site Corrections.
 +
Enter the desired production month and Analyst.
 +
The same site selection screen will appear as in the normal monthly original entry.  Select the desired site to correct.
 +
The difference in the product screens for monthly production ENTRY and monthly production CORRECTION is that instead of showing the data for the current month AND the previous production month, the initial screen will show the same data in both positions.  As you change something on a product, you can always see what WAS as well as what is NOW.
 +
So what happens if you have be entering production for a site for given products for given months and all of a sudden you are told that you need to enter production for a past production month for a product you didn't know existed in that past month or maybe you need to add a whole new production month.
 +
This can be done in the single well correction screen.  First, highlight the site that needs to have added production months.  DO NOT OPEN THE SITE.  At the top of the selection screen, next to the Period item is a small calendar icon as shown below.
 +
Highlight the site requiring new production months.  DO NOT OPEN THE SITE. Click on the Calendar icon.
 +
The following window opens.
 +
In above example, current data input began in 01/2016 and the display shows this and a new period for 12/2015. Entering the panel adds one month and each click of Insert Period adds one month. Check the boxes for the products to be added. Checking the box on the left automatically checks all products to be entered.
 +
When complete, Click Create Records to add the new months to the database.
 +
Click Yes to approve. Use the arrows in the upper left corner to move to the correct month and click Next to enter new month data.

Revision as of 21:35, 23 August 2019

This page is currently under construction. Information displayed may not be 100% accurate.


Individual Site Corrections To correct monthly production data for a single well, select Monthly Processes / Corrections and select Individual Site Corrections. Enter the desired production month and Analyst. The same site selection screen will appear as in the normal monthly original entry. Select the desired site to correct. The difference in the product screens for monthly production ENTRY and monthly production CORRECTION is that instead of showing the data for the current month AND the previous production month, the initial screen will show the same data in both positions. As you change something on a product, you can always see what WAS as well as what is NOW. So what happens if you have be entering production for a site for given products for given months and all of a sudden you are told that you need to enter production for a past production month for a product you didn't know existed in that past month or maybe you need to add a whole new production month. This can be done in the single well correction screen. First, highlight the site that needs to have added production months. DO NOT OPEN THE SITE. At the top of the selection screen, next to the Period item is a small calendar icon as shown below. Highlight the site requiring new production months. DO NOT OPEN THE SITE. Click on the Calendar icon. The following window opens. In above example, current data input began in 01/2016 and the display shows this and a new period for 12/2015. Entering the panel adds one month and each click of Insert Period adds one month. Check the boxes for the products to be added. Checking the box on the left automatically checks all products to be entered. When complete, Click Create Records to add the new months to the database. Click Yes to approve. Use the arrows in the upper left corner to move to the correct month and click Next to enter new month data.